Confirm clear span
Steel warehouses, workshops and hangars
Cleary Building provides independent China sourcing for steel building packages. Submit one set of project criteria to compare supplier quotations, document exclusions and plan inspection before shipment.
Cards name the frame and the envelope question. They are not a catalogue price.
Confirm clear span
Crane load stated first
Door height in metres
Core chosen after fire strategy
These counts describe the sourcing checklist. Supplier throughput and qualification remain separate, project-specific checks.
These illustrative briefs show how buyers can define the quoted scope before comparing prices. Confirm the listed criteria with the project engineer and the candidate supplier.
Illustrative RFQ: A coastal warehouse brief asks every supplier to price the same exposure, coating system and touch-up scope. Record site-weld repairs separately from the shop coating allowance.
Illustrative RFQ: A workshop brief includes crane wheel reactions, runway length and operating class. Separate runway beams from crane equipment before comparing supplier totals.
Illustrative RFQ: A hangar door brief states the clear opening under deflection and the door supplier’s support reactions. Record who prices the head beam, guide steel and interface drawings.
Illustrative RFQ: A 40x60 foot workshop brief compares welded pieces with bolted shipping splices. Ask each bidder for maximum piece dimensions and weights, plus the field splice hardware list.
Scroll the row. Each use changes a different input.
Dock levellers and future racking loads belong on the collateral line, or the slab and frame diverge.
Tail height, door type, and internal clear height in metres decide the gable, not a generic hangar label.
Welding fume, crane class, and mezzanine live load are stated before girts are spaced.
A rock wool or PIR sandwich panel is chosen after the fire strategy names the wall, joints, and doors.
Salt exposure pushes galvanized coating mass and cut-edge repair onto the coating procedure.
Wide doors and intermittent collateral loads from overhead utilities change the girt design.
Ask for the blank or checklist that matches the inquiry stage. For supplier-issued records, confirm the document owner and project revision.
A 40x60 or 30x40 bay is a plan size. Eave height, ground snow load, door leaves, and a crane change the steel tonnage. Send the country and the loads you know. Missing lines are marked before anyone discusses a comparable quotation.
Submit the criteria you have